Construction at Lot #31
<p> <span style="line-height: 115%; font-family: "Calibri","sans-serif"; font-size: 11pt; mso-ascii-theme-font: minor-latin; mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-hansi-theme-font: minor-latin; mso-bidi-font-family: "Times New Roman"; mso-bidi-theme-font: minor-bidi; mso-ansi-language: EN-US; mso-fareast-language: EN-US; mso-bidi-language: AR-SA;"><font color="#000000">Crews will be on site driving the test piles for the new Art Building on December 27<sup>th</sup> and 28<sup>th</sup>. The work will be taking place in Lot #31. The new Art Building is scheduled to open in 2014.</font></span></p>
Posted By: Pamela Kiger
Date: Fri Dec 28 00:27:00 EST 2012